ACEP At Work – Pilgrim Hot Springs Geothermal Assessment Weekly Project Update
-T4 rig drills 22 inch hole 140 feet deep
-18 inch casing welded together, inserted in hole, and cemented in place
-Schramm drill repaired and drilling again
-NEXT WEEK: Total depth should be reached and the hole properties will be analyzed
View Tuesday’s article in the Alaska Dispatch: Geothermal could be key to figuring out Nome's costly power problem
To receive the daily updates contact Max Frey (mefrey@alaska.edu).
Photo Caption: Casing is maneuvered over the hole and welded together.
Photo courtesy of C. Pike ACEP/UAF